3000W Wind Solar Hybrid Controller , 300V AC Solar Wind Controller
User should connect and operate according to following procedures after all the parts installation of wind power system are finished.
Step 1Open the package, and then install the product after users make sure the product without any damage.
Step 2When the dump load is separated, user should use copper wires and connect the dumpload box output line to “DUMP LOAD” terminals in control box.
Step 3Connect the controller DC output terminals to grid-tied inverter. Connect wind turbine output line to control box “WIND INPUT” terminals when the wind turbine is under static status or in low speed running status.
Step 4Check whether all the connections are correct and firm.
Product Model |
TM-B-W-3KW (wind/solar hybrid controller for 3KW off-grid system ) |
Rated Wind Turbine Input Power |
3KW |
AC input Voltage Range |
0-300Vac (line voltage) |
Dumpload Start Voltage |
250Vdc (Adjustable) |
Volts D.C after dump load works (recification ) |
300Vdc (adjustable ) |
Delay setting before dump load works |
20 Min(adjustable ) |
Display Mode |
128*64 LCD |
Display parameters |
Turbine input power , voltage ,current , generating capacity |
Controller size (L*W*H) |
415mm *350mm *150mm |
Dump Load size (L*W*H) |
420mm* 375mm* 173mm |
Ambient Temperature & Humidity |
-40~+70℃/35~80%RH(Exclude LCD ) |
Wind/solar hybrid controller for 3KW off-grid system